Sokoto right-of-way fees for fibre

The Sokoto fibre guidelines, signed December, 2023, cite the Right Of Way Regulation 2023. They print “NGN145/ linear metre” for a right of way, “NGN 500,000 per site” for a base transceiver station, and “NGN 300,000 per m2” for other ground installations. A free MarkMyProperty’s listing at /mark does not pay this charge or register the transfer.

By MMYP TECHNOLOGIES (OPC) PRIVATE LIMITED, operator of MarkMyProperty. Head office: Delhi NCR, India. Updated . This page does not score listings.

Coverage: Sokoto State Urban and Regional Planning Board fibre-installation guidelines, signed December, 2023, under the Right Of Way Regulation 2023.

Three fees the guidelines print

Step 4 says the fees follow the “Sokoto State Urban and Regional Planning Board Right Of Way Regulation 2023”. It prints “NGN145/ linear metre for Right of way (ROW)”, “NGN 500,000 per site for Base transceiver station (BTS).”, and “NGN 300,000 per m2 occupied on the ground” for other installations such as street cabinets. The space in “NGN145/ linear metre” and in “NGN 500,000” is left as printed.

The signature line reads “December, 2023”. The opening also cites “Edict No.7 of 1995”.

  • A right of way prints “NGN145/ linear metre”.
  • A base transceiver station prints “NGN 500,000 per site”.
  • The guidelines are signed December, 2023.
  • A free MarkMyProperty’s listing at /mark does not pay this charge or register the transfer.

Sources and further reading

Frequently asked questions

What right-of-way rate do the guidelines print?

A right of way prints “NGN145/ linear metre”.

What date is on the guidelines?

The guidelines are signed December, 2023.