Skip to content

Analytics

Google Analytics and Google Ads stay off until you allow analytics. Essential sign-in and saved-property storage work either way.

You can change this choice at any time using Cookie preferences in the footer. Privacy Policy

MarkMyProperty

Nigeria property guide

Ekiti C of O processing fee order

The Ekiti CofO procedure’s fee order prints “Application Form” with “5,000.00” and “Stamp Duty” with “3% of the Land Value”. The fee lines do not print a year. A later file prints different figures.

By MMYP TECHNOLOGIES (OPC) PRIVATE LIMITED, operator of MarkMyProperty. Head office: Delhi NCR, India. Updated . This page does not score listings.

Coverage: Ekiti State Bureau of Land Services process for a certificate of occupancy, Annexure 1. The fee lines do not print a year. The header prints “COST” and, on the next line, “N”.

Requirement lines that carry a figure

The annexure is headed “CoFO PROCESSING APPROVED FEES ORDER”. A line prints “AREA” and “COST”. The next lines print “REQUIREMENTS” and then “(SQ MTR)” and “N”. The cells quoted below do not themselves print “N”.

A line prints “Application Form” and “5,000.00”. A line prints “C. of O. Fee” and “50,000.00”. A line prints “Excess of above 1000sqmtr” and “Additional 50.00/Sqmeter”. A line prints “Land-Use Clearance” and “2,000.00”. A line prints “Advertisement” and “10,000.00”. A line prints “Surveyor-General Approval” and “5,000.00”. A line prints “Stamp Duty” and “3% of the Land Value”. Nearby lines print “Ado-Ekiti”, “(State”, and “Capital)” and no figure.

A later line prints “Excess of above 1000sqmtr” and “Additional 37.50/sqmeter”. A line prints “Excess of above 1000sqmtr” and “Additional 25.00/Sqmeter”. A line prints “37.50/sqmeter” and no requirement. A line prints “C. of O. Fee” and “100,000.00”. A line prints “Excess of above 1 Hectare” and “Additional” and no figure. The next line prints “Land-Use Clearance” and “10,000.00/Hectare”. A line prints “Advertisement” and “5,000.00”. A line prints “Surveyor-General Approval” and “10,000.00”. A line prints “Stamp Duty” and “5,000.00”. The next line prints “3% of the current value of”. This page does not move that percentage onto the “5,000.00” line.

A line prints “Land-Use Clearance” and “5,000.00/Hectare”. A line prints “Excess of above 1 Hectare” and “10,000.00/Hectare”. A line prints “Excess of above 1 Hectare” and “5,000.00/Hectare”. A line prints “Excess of above 1 Hectare” and “2,500.00/Hectare”. A line prints “Land-Use Clearance” and “2,500.00/Hectare”. Place names such as “Other Towns” and “Industrial” sit on lines that this page does not treat as the figure line unless the figure is printed there.

  • A line prints “Application Form” and “5,000.00”.
  • A line prints “Stamp Duty” and “3% of the Land Value”.
  • A free MarkMyProperty’s listing at /mark does not pay this charge or register the transfer.

The other file prints different figures

The citation line prints “Lands Use Act No. 6 of 1978”. The fee lines do not print a year. This page does not treat 1978 as the date of the fees.

The Bureau file signed 27th December, 2025 prints “10,000.00” on an application-form line and “0.375% of the Land Value” on a stamp-duty line. This page quotes the procedure file and does not pick between the two printings.

  • The fee lines do not print a year.
  • This page does not pick between the two printings.
  • A free MarkMyProperty’s listing at /mark does not pay this charge or register the transfer.

Sources and further reading

Frequently asked questions

What does an application-form line print?

A line prints “Application Form” and “5,000.00”.

What does a stamp-duty line print?

A line prints “Stamp Duty” and “3% of the Land Value”.

Does this page choose between the two files?

This page quotes the procedure file and does not pick between the two printings.

Continue with these guides and tools