Skip to content

Analytics

Google Analytics and Google Ads stay off until you allow analytics. Essential sign-in and saved-property storage work either way.

You can change this choice at any time using Cookie preferences in the footer. Privacy Policy

MarkMyProperty

Nigeria property guide

Gombe building plan charges

The GOSUPDA page prints “One Bedrooms Bungalow -N 15,000.00” and, in the revised charges, “One Bedrooms Bungalow N 15,000.00”. One line prints “COMMENCING 1”. The next line prints “ST JANUARY, 2021”. A free MarkMyProperty’s listing at /mark does not pay this charge or register the transfer.

By MMYP TECHNOLOGIES (OPC) PRIVATE LIMITED, operator of MarkMyProperty. Head office: Delhi NCR, India. Updated . This page does not score listings.

Coverage: Gombe State Urban Planning and Development Board building-plan charges. The revised heading splits the commencement date across two lines.

Two printings of the bungalow lines

Under “1.1 HIGH DENSITY”, one line prints “One Bedrooms Bungalow -N 15,000.00”. The next line prints “Two “ – N 20,000.00”. The next line prints “Three – N 25,000.00”. The next line prints “Four “ – N 30,000.00”. The next line prints “Add 5,000.00 for any additional bedroom”. The line after that prints “over the maximum of four Bedrooms”.

The revised heading prints “REVISED BUILDING PLAN CHARGES IN URBAN AREAS”. The next line prints “COMMENCING 1”. The next line prints “ST JANUARY, 2021”. Under “1.6 HIGH DENSITY (PLOT SIZE NOT EXCEEDING 500SQ. METRES”, one line prints “One Bedrooms Bungalow N 15,000.00”. The next line prints “Two “ “ N 20,000.00”. The next line prints “Three “ “ N 25,000.00”. The next line prints “Four “ “ N 30,000.00”. One line prints “Add 5,000.00 for any additional bedroom over the maximum of four Bedrooms.” This page quotes both printings and does not pick.

In the medium-density lines, one line prints “One Bedrooms Bungalow N 15,000.00”, another “Two N 20,000.00”, another “Three N 30,500.00”, and another “Four N 35,000.00”. In the low-density and very-low-density lines, one line prints “One Bedrooms Bungalow N 25,000.00”, another “Two N 30,000.00”, another “Three N 40,000.00”, and another “Four N 50,000.00”. The very-low heading prints “VERYLOW DENSITY”.

  • Under “1.1 HIGH DENSITY”, one line prints “One Bedrooms Bungalow -N 15,000.00”.
  • The next line prints “COMMENCING 1”.
  • The next line prints “ST JANUARY, 2021”.
  • A free MarkMyProperty’s listing at /mark does not pay this charge or register the transfer.

Other charges, and figures left on their own lines

One line prints “10,000.00 per room/parlor for the first five Rooms”. One line prints “5,000.00 per room for the next 5 Rooms”. One line prints “Exceeding ten rooms charges will attract additional”. The next line prints “– N 5,000.00/Room”. One line prints “Wire fencing N 50,000.00”. One line prints “Railing N 50,000.00”. One line prints “Block Walling N 50,000.00”. One line prints “For perimeter walling exceeding 200 metres long, the charge”. The next line prints “will be N100,000.00”.

One line prints “Shops (not exceeding 2 by 3 metres N 15,000.00/shop”. One line prints “Shops above 2 by 3 metres N 20,000.00/shop”. One line prints “Ware house N 1000/m2”. One line prints “Hotels N 1000/m2”. One line prints “Filling station N75,000 per pump”. One line prints “Food carteen N 50,000.00”. One line prints “Nursery/Pre-Nursery N 50,000.00”. One line prints “Primary School N 100,000.00”. One line prints “Mosque/Church N 30,000.00”.

The line “4.0 INDUSTRIAL DEVELOPMENT N1000/M2” prints that rate. The next lines print “Farm house poultry”, “Light Industry/Small scale”, “Medium industry”, and “Heavy industry” with no amount. One line prints “Property walling/fencing -N 50,000.00”. One line prints “Block moulding sites N 100,000.00”. The line “5.0 HEALTH FACILITIES DEVELOPMENT N 1000/M2” prints that rate. “Pharmaceutical Chemist”, “Health centre clinic”, “Hospital”, “Dispensary”, and “Patient medicine STORE” are on later lines with no amount. One line prints “Property walling and fencing N 50,000.00”.

One line prints “Traditional house/building N 5,000.00”. One line prints “Modern structure N 10,000.00”. The line “7.0 COMMERCIAL N70/M2” prints that rate. One line prints “Shop/Staff N10,000 per shop”. One line prints “Hotel/Restaurant N500/M2”. One line prints “Petrol/Filling Station N75,000 per pump”. The line “11.0 GENERAL TEMPORARY STRUCTURES IS N10,000.00 PER SHADE” prints that rate. One line prints “Block Making Industry N 50,000.00”.

  • One line prints “Shops (not exceeding 2 by 3 metres N 15,000.00/shop”.
  • One line prints “Food carteen N 50,000.00”.
  • The next line prints “– N 5,000.00/Room”.

Sources and further reading

Frequently asked questions

What does the first one-bedroom line print?

Under “1.1 HIGH DENSITY”, one line prints “One Bedrooms Bungalow -N 15,000.00”.

How is the revised commencement date printed?

The next line prints “COMMENCING 1”.

Continue with these guides and tools