Greece property guide
Greece electronic building identity at a transfer
For a category II building, the Environment Ministry’s 30 December 2020 announcement says the electronic building identity is filed when the building or divided property is transferred, and the declaration is attached to the contract. An authorised engineer issues the certificate of completeness. It has a unique number and states the KAEK. After 31 January 2021 that announcement says recording is electronic and without charge. A free /mark listing does not file the identity. The gov.gr page did not open, so no click path is copied from it.
By MMYP TECHNOLOGIES (OPC) PRIVATE LIMITED, operator of MarkMyProperty. Head office: Delhi NCR, India. Updated . This page does not score listings.
Coverage: Greece. Three Environment Ministry announcements, read on 12 November 2026: 11 December 2020, 30 December 2020, and 26 January 2021. This is not the KAEK buyer checklist, the ENFIA page, the energy-certificate page, or the transfer-tax exemption. The gazette text of FEK B’ 5447 was not opened.
What is filed when an older building is transferred
A free /mark listing does not file the identity. Publishing on /mark is an advertisement. It does not submit an electronic building identity, and it does not attach a declaration to a Greek notarial contract.
The ministry announcement posted on 30 December 2020 says that, after a pilot running through 31 January 2021, recording of the electronic building identity and of the identity of an autonomous divided property is mandatory and is done exclusively electronically and without charge. It says the identity records the existing state of the building or divided property and of their permits, and the changes during their life. For category II, the announcement says the filing is made at the transfer and the declaration is attached to the contract.
- Publish the sale on MarkMyProperty’s free /mark flow. That listing does not file the electronic building identity.
- For a category II building or autonomous divided property, the 30 December 2020 announcement says the filing is made when it is transferred, and the declaration is attached to the contract.
- That announcement says an authorised engineer issues the certificate of completeness. It has a unique number and it states the KAEK of the plot or of the divided property.
- That announcement says that after 31 January 2021 the recording is exclusively electronic and without charge.
Who must enter, and the two categories
The same 30 December 2020 announcement says two groups must enter the system: new buildings and divided properties for which new building permits are issued, and older buildings at the moment of their transfer. It divides buildings under law 4495/2017 into two categories. Category I is buildings of the State, local authorities, and public-law bodies, and buildings that house their services; public-assembly buildings, including libraries, museums, sports facilities, and public-transport interchanges; liquid-fuel stations, vehicle workshops, or car washes; tourist accommodation above 300 square metres; public and private preschool, primary, secondary, and tertiary education buildings; hospitals, clinics, health and mental-health centres, nurseries, boarding houses, care homes, and institutions for the chronically ill or for persons with disabilities; and detention facilities, including special youth detention facilities. Category II is every other building and every autonomous divided property, whatever its use.
For category I, that announcement gives five years to record the identity. For category II, filing is at the transfer, and the declaration is attached to the contract. It names the system’s users as authorised engineers, and the competent public services and their staff acting in their duties. The certificate of completeness is issued by the authorised engineers. Their declaration certifies that the identity particulars are complete. The certificate is issued for a building or for a horizontal or vertical divided property, it has a unique number, and it states the national cadastre code, the KAEK, of the plot or of the divided property.
If a false statement is found, that announcement says that, besides criminal penalties, there is a fine from 2,000 to 20,000 euro, depending on the area that was not recorded on the identity. It says those limits double for a repeat, and when the works are in a traditional settlement, an area of particular natural beauty, or a protected area. It does not print a further formula for the amount inside that range.
The certificate fee on a different announcement
The 11 December 2020 announcement says recording of the building identity and of the autonomous divided-property identity is exclusively electronic and without charge. The same announcement says the reciprocal fee the Technical Chamber of Greece may charge, solely for issuing certificates, is 20 euro per certificate issued. It says the decision was published in FEK B’ 5447 and that the Chamber would develop the system by 31 December 2020. This guide does not restate the gazette articles. The 20 euro is the certificate fee that announcement prints. It is not a rewrite of the “without charge” sentence, which that page uses for the recording.
The 26 January 2021 announcement says that from 1 February 2021 the pilot ended and the identity became mandatory. It says two ministerial decisions start the electronic register and set the recording procedure, the required documents, and the form of the identity and of the certificate of completeness. That announcement does not list the documents and does not print the 20 euro fee. The gov.gr service page did not open on 12 November 2026, so this guide does not copy a click path or a later fee from it.
Sources and further reading
- Hellenic Ministry of Environment and Energy: electronic building identity announcement, 30 December 2020, read 12 November 2026
- Hellenic Ministry of Environment and Energy: register and 20 euro certificate fee, 11 December 2020, read 12 November 2026
- Hellenic Ministry of Environment and Energy: identity mandatory from 1 February 2021, read 12 November 2026
Frequently asked questions
Does the free listing file the electronic building identity?
A free /mark listing does not file the identity.
When does category II file the identity?
For category II, the announcement says the filing is made at the transfer and the declaration is attached to the contract.
Is the recording charge the same sentence as the 20 euro certificate fee?
The 11 December 2020 announcement says recording of the building identity and of the autonomous divided-property identity is exclusively electronic and without charge. The same announcement says the reciprocal fee the Technical Chamber of Greece may charge, solely for issuing certificates, is 20 euro per certificate issued.
Continue with these guides and tools
- Greece property map and listings
- Kallithea property map
- Piraeus property map
- Athens property map
- Open the free MarkMyProperty listing flow
- Buying Property in Greece: Taxes and Costs Beyond the Asking Price
- ENFIA Explained: A Property Owner’s Checklist for Greece
- KAEK and Cadastral Records in Greece: A Property Buyer’s Checklist
- Energy Performance Certificate in Greece: How Buyers and Renters Read a PEA
- Greece: the first-home exemption from transfer tax
- Greece small-settlement ENFIA reduction
- Browse properties offered for sale in Greece
- Browse properties offered for rent in Greece
- Check a listing before contacting or paying
- Compare asking prices on a consistent basis